Architecture & Civil EngineeringBuildingsChemical Industry

Diffutherm: Vicoma Designs Production Facility at Risk of Explosion

About the Project

Diffutherm had been located near a residential area in Bergeijk since 1965. Constraints were hindering further growth. It was time to take action. Diffutherm enlisted Vicoma to provide guidance and advice in the search for a suitable, safe site for new construction in the region.

Vicoma’s Role

Vicoma was closely involved in the land acquisition and development of a new production plant at the Kempisch Bedrijven Park in Hapert. Diffutherm is classified as a BRZO and BEVI facility because a large number of its raw materials, semi-finished products, and finished products are flammable and pose environmental hazards.

Explosive gas mixtures can form during the production process. For this reason, strict requirements are in place.

Vicoma specializes in the storage, handling, and production of hazardous materials. In our design, we adhered to the PGS-15 guidelines—both in our choices regarding building and fire safety and in our production facilities. As a result, we implemented the following safety measures: small fire compartments, a fully sprinklered building with foam injection, gas detection, room ventilation combined with process ventilation, and firewater collection in the production areas and the PGS storage areas.

Result

A functional and integrated design, in which energy management was also a key focus. A complex with maximum safety, achieved through effective project management and rigorous supervision on our part.

A spacious industrial interior with exposed pipes and large overhead structures.
A modern industrial building labeled "Diffutherm" is situated behind a wide, green field under a partly cloudy sky.

Expertises

Architecture & Civil Engineering

Markt

BuildingsChemical Industry
A man wearing glasses and a light green blazer smiles at the camera against a neutral background.

Louis and his team can tell you all about Electrical Engineering.

Louis Nagelmaker

National Business Development Manager

Main question

How do you design a safe and compliant production facility for a BRZO company that handles explosive substances?

Result

A safe, functional, and energy-efficient complex, made possible by rigorous project management and a comprehensive approach.

Accompanied by

Location

Hapert

Various projects completed

Our consulting and engineering firm works with a wide range of clients on single- and multidisciplinary projects, taking a pragmatic and flexible approach.

Read all projects

“Gunvor: Vicoma Develops Solution to Reduce Arc Energy”

An electric arc occurs when an electric current jumps between two conductors. For example, due to a short circuit. This can lead to intense heat with dangerous consequences. The energy…

Read all about it here

Together, we offer a wide range of expertise

At Vicoma, we bring together a wide range of expertise, from engineering to project management, enabling us to tackle complex technical challenges in a comprehensive and well-considered manner.