Mars Veghel: Vicoma Provides Support for the Expansion of the Chocolate Factory

About the Project

A new production line. Mars needed one and asked us to help come up with a solution. Since it turned out to be impossible to implement this within the existing building, we jointly decided to expand. Fortunately, there was enough space on the site to build a new facility that connected to the existing complex. We handled the basic engineering for the expansion of the factory in Veghel. We also took care of the preparations for demolition and provided supervision during construction.

The Role of Vicoma

Vicoma has developed a comprehensive plan for the expansion. We have begun the basic engineering for the building, including HVAC, lighting, utilities, and the sprinkler system. We have drawn up specifications for the construction bid.

Since changes also had to be made to the existing building, we performed the necessary calculations. As a result, the demolition work went smoothly. By overseeing the detailed engineering and construction, we ensured that Mars actually got exactly what we had envisioned.

Result

A modern production facility with a processing and packaging area. An extremely flexible building achieved through the use of honeycomb beams with a span of up to 40 meters. The result: virtually no columns and maximum freedom in the layout of the equipment. We incorporated spacious skylights and sound-absorbing materials into the design to ensure added comfort.

Plenty of light and minimal noise: the perfect ingredients for a pleasant workspace. Mars is very pleased with the new facility in Veghel, and it serves as a model for other production sites worldwide.

Expertises

Civil & Structural EngineeringElectrical EngineeringPiping & Mechanical

Markt

BuildingsFood and Pharmaceutical Industries
A smiling man in glasses and a suit poses for a professional portrait.

Peter and his team can tell you all about Consulting.

Peter van Dijk

Commercial Manager, Rotterdam

Main question

A new production facility that integrates seamlessly with an existing complex

Result

A modern, column-free production facility with maximum flexibility, which now serves as a model for other Mars locations worldwide

Accompanied by

Location

Veghel

Various projects completed

Our consulting and engineering firm works with a wide range of clients on single- and multidisciplinary projects, taking a pragmatic and flexible approach.

Read all projects

“Gunvor: Vicoma Develops Solution to Reduce Arc Energy”

An electric arc occurs when an electric current jumps between two conductors. For example, due to a short circuit. This can lead to intense heat with dangerous consequences. The energy…

Read all about it here

Together, we offer a wide range of expertise

At Vicoma, we bring together a wide range of expertise, from engineering to project management, enabling us to tackle complex technical challenges in a comprehensive and well-considered manner.