Enecogen: permanent and safe access routes to roofs Skip to content

Enecogen: permanent and safe access routes to roofs

Find out more about this project?

Arjan Bekooy and his team can tell you all about it

Arjan Bekooy

Arjan Bekooy

Project Manager / Procurement Engineer – Rotterdam

Other question?
Contact us directly
Back to the overview

The power plant of Enecogen was in need of two permanent access routes to the roofs of two buildings. Since the company does regular inspections on the roofs, the routes also needed to meet all safety standards. The permanent solution that was chosen means the roofs can now be reached at all times without having to the build and install expensive scaffolding.

Vicoma’s role: from engineering to construction management

Vicoma presented a number of design proposals. After consulting with the client, one of the solutions was worked out further and subsequently installed. Na overleg met de klant werd een bepaalde oplossingsrichting verder uitgewerkt en vervolgens gerealiseerd. During the engineering stage, Vicoma carried out scans and measurements, made 2D and 3D drawings, assisted in the building application, managed the procurement process, performed design and control calculations, and afterwards also supervised the project’s construction work.

enecogen

3D model of the construction

A partner that Vicoma had selected took care of production and installation. Vicoma checked the working drawings and connection calculations of the partner and did the final inspection after completion.

Result: permanent safety at Enecogen

The energy provider was able to put the new rooftop access routes into use within just a short time and according to schedule, guaranteeing the permanent safety for the buildings and staff. Moreover, this solution helps the client to save on costs, as scaffolding is no longer needed to gain access to the roofs. Cooperation between all the party involved went very smoothly and contributed to the project successful completion.

enecogen

Installation of part of the extension

enecogen

The access route, seen from the roof in the direction of the walkway

Related projects

All projects
conceptontwerp productdrager soloan vicoma
Concept design & FEA analysis for a product carrier
akzonobel
Successful pipeline route conversion at AkzoNobel Coatings
verlichtingsinstallatie marine den helder
New lighting installation leads to 35 percent reduction in energy consumption
asbestverdachte pakkingen
Suspected asbestos-containing gaskets in compressed air system
proeffabriek-ijzer
Pilot plant HIsarna: more environmentally friendly iron production
veiligheidsscan
Safety scan: a safe environment for employees
koelcapaciteit en leidingbrug
Mars increases cooling capacity and reduces CO2 emissions
cfd-berekeningen
The CFD calculations lead to devise the optimal design.